Capral has acquired EDGE from Aluminium Industries.
The Trinity College Gateway project is now complete.
Aiming to tighten links between Trinity College and the University of Melbourne, the new building contains laboratories, tutorial rooms and an auditorium as well as an art gallery, music rooms and drama spaces.
Featuring our MAX® 150 Front Double Glazed architectural framing suite, the building looks stunning, and has the thermal performance to match.
Capral has acquired EDGE from Aluminium Industries. We are excited to watch EDGE continue to grow under Capral’s stewardship.
The acquisition takes effect during June and Capral will progressively integrate the EDGE range across its supply network.
Any enquiries can be directed to [email protected]