Caribbean Park phase 3 is one of our favourite projects to feature our MAX® Structural Glazed 150mm Framing and Curtain Wall. A member from Team EDGE stopped by during the week and was pleased to see that the 185-hectare masterplan is coming together beautifully. Since our last update, more offices, retail, and dining amenities have been added to an already impressive business precinct.
Caribbean Park Phase 3 incorporates our MAX SG150 suite as window wall on the ground floor. While levels one and above utilise the SG150 suite as curtain wall. The SG150 Double Glazed Curtain Wall features reduced head and sill sightlines, which maximises the all-glass appearance and reduces energy loss. You will also notice our Fixed Rectangular Blades have been used throughout the project. You can read more about our involvement with Caribbean Park here.
Access EDGE Technical Documents and CAD Files